CJA was contracted by Pinner Construction to install 443 – 16” diameter Auger Displacement Piles (ADP) for the Long Beach Unified School District (LBUSD). CJA broke ground December 10, 2013 and has successfully installed 12 ea. 16” diameter test piles ranging from 55’ to 78’ feet. The production piles are scheduled to start early 2014.