U220 Remedial Tunnel Grouting

In February of 2013, CJA performed pressure grouting, and disturbed ground grouting at cross passage 17 in the light rail tunnel, between the University of Washington and Capitol Hill Stations. The grouting was conducted to seal off ten decommissioned well points that were leaking and had caused ground loss behind the tunnel liner.