Projects
Moscone West Expansion
Location: San Francisco, CA

Project Partner: Subsurface Environmental Inc.

Challenge: Construction Dewatering

Overview: Condon-Johnson was contracted to install the temporary shoring and provide dewatering for the Moscone West Convention Center excavation.

Results: Condon-Johnson designed and installed the dewatering system to allow excavation of a 30 foot deep excavation of a 500 foot by 300 foot site. The scope included installing 30 dewatering wells, installation and maintenance of pumps, associated piping, back-up generator, and sediment tanks. The system was maintained for 19 months and then removed.